Thursday 18 November 2010

DRILL BABY DRILL


Oh my God, look what started drillin behind my back yard. We've had this vacant lot behind us all along, and now the times they are a changing. These guys are doing core samples. They drill down about 3 feet then they put a metal rod with a 2 foot hollow tube threaded on the bottom. The pile driver mechanism punches the tube down a couple feet further. The rod is then extracted, and the tube is removed and split in half for the Geologist to assess. 
Oddly enough, he takes samples of the clay from the bottom of the core sample, holds it to his nose, then places it in a zip-lock bag. This process is repeated dozens of times all over the property.
It seems someone is buying the property with the aim of constructing some new buildings in the downtown core. Core samples of the soil are needed to determine what kind and size of foundation is needed to support the new structures. The 5 million dollar Shoppers Drug Mart at the heart and core of our town is just about all bricked, windows are in, and they are working on the inside.  Our sweet little sleepy village is caught in those times that are a changing.